OVERVIEW

The studies will be based on the main water supply network of Bogota’s supply system (Bogotá – Madrid transport subsystem project). Its main objective is to design a system that will supply at least 50% of the future water demanded by the Facatativá municipality.

SCOPE

Feasiblity studies of the transport subsystem for the water supply of the Facatativá municipality using the network infrastructure of the Water Supply System of Bogotá.