Sanitary engineering
Supervision of the optimization and rehabilitation of the Francisco Wiesner Water Treatment Plant
Potable water treatment plant, PTAP
SUMMARY
The Francisco Wiesner water treatment plant which belongs to the Chingaza supply system treats water for supplying the city of Bogotá. INAR ASOCIADOS S.A supervised the optimization of the plant up to a capacity of 19.2 m3/s.
SCOPE
Supervision of the optimization works for the PWTP Francisco Wiesner, located in the municipality of La Calera, department of Cundinamarca; which included the supply, installation and implementation of new under drains for 16 filtering units of the plant, air filter washing system and new filter beds.

PWTP Wiesner