SUMMARY

The rehabilitation and optimization design of the treatment plants included the following components:

  • Pre sand trap
  • Fast-mixing units
  • Chemical dosing system
  • Mechanical flocculators
  • Accelerated settling tanks
  • Declining rate filters
  • Inter-connection pipeline and channels between units
  • Flow measurement system
  • Disinfection system

SCOPE

Studies and design for the restoration and optimization of El Portico and Carmen de Tonchalá water treatment plants located in the city of San José de Cúcuta.